Constructability is still not a very common project management technique.  Currently, 90% of contractors don’t incorporate constructability into their project management. This is because of their lack of industry awareness and failure to acknowledge the advantages of a skilled constructability consultant in Vancouver’s market. 

 

Nothing is more problematic for contractors than projects that take longer than expected or are over budget. Constructability consultations in Vancouver assist contractors in avoiding this by bringing on-site construction experience into the design process.

Feasibility Review for any Construction Project

The course of action to be taken in a construction project depends on a variety of variables. 

You might be having some common doubts:

Constructability is a project management application that is used in the construction industry. Its main objective is to assess and evaluate the aggregate expertise of the project consultants, contractors, architects/designers, and clients in an effort to maximize efficiency, reduce waste, and finish construction projects on time or earlier.

 

Project management can be thought of as a roadmap. Constructability is arranging a road trip with your pals, plotting the course on a map, loading up the car, and driving.

 

By preventing construction-related delays, rework, and waste, a constructability consultant assists in lowering project risk and overall project cost. We make sure that projects can be built, are affordable, and can be maintained.

What Is A Constructibility Consultant?

Constructability Consultant

The 3 Tenets Of Constructability

Constructability can be defined as the evaluation and application of three fundamental objectives and procedures:

  1. The utmost degree of construction ease that a structure’s design will provide while still adhering to building codes
  2. Team integration of construction expertise throughout the design phase to identify the most cost-effective building methods that meet design objectives
  3. Integration of construction knowledge among the team members throughout construction to guarantee the least amount of environmental impact.

It is well known that the construction sector is one of the major producers of energy waste and environmental pollution. After all, solar electricity is not used to power cranes or cement trucks. The construction industry contributes to 40% of the world’s energy consumption, 50% of its garbage, and 50% of its natural resources.

 

The discipline of constructability in project management has never been more important given the current socioeconomic climate’s desire for every man, woman, child, and contractor to “Go Green.” We at Collab Management can help you achieve this with our constructability consultants in Vancouver.

Constructability And Social/Environmental Responsibility

Benefits Of Constructability Beyond Cost Savings

Proper constructability implementation yields both practical and abstract advantages. Projects that are efficiently and speedily carried out and finished with constructability not only earn everyone a satisfying paycheck but also strengthen the reputations of all parties concerned.

 

One quick benefit to your team’s reputation is the ability to finish a project on time and on budget. Everyone enjoys making savings, especially when they total seven figures for significant projects.

 

Teams show potential clients that they can complete design and construction goals that are not only cost-effective by using the most basic tools and materials instead of pricey, pointlessly complex equipment, but that waste can also be further reduced by using constructability during design, planning, and building, which results in an appealing final project.

Constructability is a tool for ongoing project review during design, planning, construction, and completion. We advise adopting a checklist method at every stage, especially if you are first implementing constructability in your project management.

Using a checklist is an easy approach to make sure that you are fulfilling design objectives while also saving money, using less energy, and managing waste. The most crucial evaluations that should be carried out during your project management include, but are not limited to:

Design Stage

● Examine whether the construction design is realistic (between the contractor, client, consultants, and architects/designers); architects can occasionally get carried away, and constructors know what is feasible or not.
● Check to see if the design can be carried out on a budget.
● Examine whether the design will require more time to implement than the project has been given.

Planning Stage

● Review the materials that are most cost-effective while still accomplishing the design’s goals and those that will be required to finish the design.
● Eliminate unnecessary building equipment by evaluating which tools are required and which can be done without.
● Perform a cost-benefit analysis on the demands for the quantity of equipment (i.e., will purchasing more tractors to complete each duty more quickly save money on the project than using one tractor for several roles that take more time)?
● Review the soil composition of the proposed location and how it will affect the project.

Putting Constructability Into Practice

Building Stage

● Check to see if the construction is moving along according to schedule or is running behind.
● Check to see if the design goals are being realized.
● Review the management of building waste.
● Check once more to see if any unnecessary, excess equipment is being used during site-building.

Ready To Get A Constructability Consultant In Vancouver?

Recall that we said 90% of contractors are still not using constructability in their project management? Make use of this to your benefit. Constructability often increases the likelihood that a project will be completed on schedule and for less money. Efficiency is increased via joint efforts from all parties involved, improved communication, and consensus among all stakeholders before moving forward at each stage.

At Collab Management we can provide you with the constructability consultation you need! Our Vancouver consultants have the skill and knowledge required to take your project management to the next level while keeping your budget in mind. Contact us today to learn more about Collab Management’s constructability consultant in Vancouver.

LET US SHOW YOU AN ENHANCED WAY TO BUILD

Call Now

FREQUENTLY ASKED QUESTIONS

Through a feasibility study, you can determine if a plan or project is feasible and doable in order to determine if it should be pursued. It is possible to identify the strength and weaknesses of a plan through a feasibility study.
It is important to include the level of resources and technology required as well as the expected return on investment in a feasibility study.

Feasibility studies are beneficial in several ways, such as helping project managers discern the pros and cons of undertaking a project before investing significant resources and time into it. In addition to providing vital information, feasibility studies can aid a company’s management in avoiding risky business ventures.

Technical feasibility

○ Legal

○ Operational feasibility

○ Realistic project timeline

○ Economic feasibility

Constructability review is a procedure used during project design to include construction expertise. There is a push in the industry to encourage early construction engagement in project planning.

  • Image outcome
  • Sections of the construction contract must be checked for accuracy.
  • The scope of the project. 
  • Amount agreed upon.
  • Timetable for the project.
  • Contract documentation
  • Method of resolving disputes.
  • Termination for ease of use.
  • No consequence for the delay.

The building regulations specify strict standards for building design and construction. Building regulations permissions can be obtained through the local authority’s building control department or from an accredited inspector.

It is proposed that constructability reviews be conducted in five stages:

  • Structural
  • Building Envelope
  • Interior Architectural
  • MEP
  • Sitework.